BEAUTIFUL DESIGN - GOOD FENG SHUI - EXECUTE PROFESSIONALS - MAKES BEAUTIFUL CONSTRUCTION

untitled-12-4660.jpg
slider2-0808.png
slide-0654.png
slide1-1820.png
slide2-8995.png
slide1-2813.png
slide4-6177.png
slide-4226.jpg
slide5-5697.png
561-5097.jpg
5611-2772.jpg
56111-8866.jpg
untitled-1-6728.jpg
untitled-2nga-1398.png

SUSTAINABLE BUILDING - ETERNAL TRUST

Quoc Cuong Trade Construction Co., Ltd! Typical brand, product and service of APEC 2017. Typical Entrepreneur of APEC 2017. Prestigious Business in 2009 to 2016. Contact Us: 0988558879 * 0903831312 * nhatienche.vn; xaynha.com

Building prefabricated house

BUILDING PRE-FABRICATION, CONSTRUCTION BUILDING

- After completing the design of pre-engineered steel buildings, you have the following components: - A complete set of technical design documents, construction permit. This is the basis for continuing the work of selecting pre-engineered steel buildings. However, if you are not satisfied with the quality of the above mentioned documents, you can proceed to check the records at the specialized units.

- The next task is to select a reasonable contractor builder. Reasonable means to be skilled, to do good quality, reasonable price, fast construction time, good occupational safety. It is not easy to choose a contractor, though the number of contractors is very high. For most common measures, ask your acquaintance, asking them for the well-known bid team. This measure is quite safe, although not always successful.There are, of course, many other ways to find a good contractor, depending on your understanding, relationship and approach.

       A good contractor is a contractor: The contractor must have a university degree in construction (eg the Faculty of Construction _ Polytechnic University), with many years of practical experience outside the field, specialized in construction field, team Highly skilled commanders, highly skilled workers, highly skilled workers, complete construction equipment, direct construction (not delivered to subcontractors), reasonable price, labor safety , on schedule and especially minimally arising. Board of Directors regularly inspect the project, motivate staff and workers to work well, safe labor ...

       The selected contractor shall be a good contractor for the construction of good quality prefabricated houses, reasonable prices ...

       Good contractors have a lot of experience and good capacity to comment on the investor to build a prefabricated house, for the beautiful and durable pre-engineered buildings.

 

QUOC CUONG CONSTRUCTION TRADING CO., LTD

     PRICE PREPAYER, PREPAYER DESIGN. FACTORY AGRICULTURAL FACTORY. INVESTOR: ANH NGUYEN TOAN LOCATION: EA SÚP DISTRICT, DAK LAK PROVINCE.February 2017 .

 

QUOC CUONG CONSTRUCTION TRADING CO., LTD

 PRE-INSTITUTIONAL HOUSES AND BUILDINGS. FARMING AGRICULTURAL PROCESSING FACTORY. INVESTOR: ANH NGUYEN TOAN LOCATION: EA SÚP DISTRICT, DAK LAK PROVINCE. May 5, 1974 .

 At present, many construction companies only receive the completed works and then sell them to subcontractors (the main contractor retains 15% - 30% of the contract value, subcontractors only account for 70% - 85% of the contract value). this makes shoddy work, delays and many subcontractors will arise to compensate for the difference that the main contractor has to eat blocking. Even the main contractor of the subcontractor's subcontractor has no contractual conditions for work in progress. ... Many of the supervisors of the subcontractor tend to be subcontractors (usually 1% 2% of the value of the works) make the building worse, etc. There are some cases where the subcontractor still sells the work to another team, often called B "(B commencement). which falls into these cases is considered complete failure, bitter swallowing ...

       For example, if the main contractor receives a project worth 10 billion VND. The main contractor that sells the contract is 15% or 1.5 billion.The remaining subcontractor is 10 billion - 1.5 billion = 8.5 billion (on paper, the reality does not come) and the subcontractor also wants to make a profit of 10% or 0.85 billion and subcontracted workers also rolled The supervisor oversees the main contractor 1% or 0.085 billion. So the value of the work is only 8.5 billion - 0.85 billion - 0.085 billion = 7.565 billion. Not to mention the subcontractor's withdrawal from the main contractor + accountant + cashier of the main contractor made it difficult and subcontractors lost another significant amount of money. From here the subcontractor seeks to reduce the quality of work to compensate for the lost money. In this case the investor certainly get poor quality villa projects, 

Meanwhile, if you direct the contractor to directly execute (you should choose the contractor directly construction) with a profit of 10% equivalent to 1 billion. The value of the remaining works is 10 billion - 1 billion = 9 billion and this makes the works much better than  the case of selling the contract (because of the value of the construction contract is only 7.565 billion maximum, of course works will be of poor quality. It is difficult for sub-contractors to get the full amount of VND8.5bn from the main contractor. The main contractor and some key contractor staffs find this reason for deduction and subcontracting. These are very damaging to the owner and difficult for the workers involved in the construction of the villa (sub-contractors can not afford to pay workers timely compensation ...) 

If the subcontractor (usually called B ') sells the contract to another contractor (usually called B "), the value of the project is only 6.3 billion VND. The quality of the villas is very poor, they are degrading, they are half life and they are used for repairs, they are not even used ... The main contractors that sell subcontracting are usually Poor quality, slow progress, not safe labor.

       The cost of building a factory, building a home depends on the capacity, prestige and responsibility of each contractor. The contractor has a high reputation, responsibility, good quality products, good aesthetics, reasonable price. Bidders who are weak, irresponsible, have no prestige will always receive lower prices and poor quality of work or incident. So the work quickly degraded, ...    

       Investors should not choose low-priced contractors (mostly contractors), because they will extract the workpiece, make poor quality works and draw up for profit. If they do not do this, they will work in moderation, extend the construction period and may abandon the work at any time.Some contractors bid low to lure customers, some customers see low prices and choose, so will be very harmful. Because when the bidder left the bargain they chose the poor quality material to compensate for the difference. For example: They choose fine sand, with impurities cheaper than clean sand with seeds up to 60% of cost. Iron doors are made of thin iron, wooden doors are of poor quality (cost is up to 30%) of water supply pipes used in combination (very fast aging, poor life), electrical appliances also use a combination. Iron and steel are used in combination (cheaper than steel mill 12%), mixed with steel mill, .... These things do poor quality, fast deterioration. It is also very important that the contractor or the contract or the contract is unclear, many items that you do not belong to the profession is unknowable and to the public. You will find that the reality is lacking, unreasonable and require modification, the extra work will be right in the dark contractor's dark intent and must arise to the team price up or higher. The cost of the contractor is good. On the other hand, when you choose a low-cost contractor, they are not eligible for workplace safety for workers, homes and people around them and are likely to cause adverse consequences for the project and you. is the first person to suffer. When choosing the wrong contractors, you will see the shortage, affecting the work, life. Low cost contractors tend to suffer losses, so they find new build contracts at low prices (they only receive the lowest bid) and pay the new contract to compensate for the loss of previous projects. there. This is extremely dangerous, because the money for the second work offset the hole of the first work, similar to the third work to compensate for the second work and the next development is taking the second (N + 2) make up the second (N + 1), nth (N), ... By this time the hole is too much, they are out of control and run away, leaving the payroll debt workers, In this case you lose money without the works to use. Low price tenderers of course, they are weak in all aspects: weak expertise, no financial capacity, poor management capacity. The suppliers of materials for these weak contractors are often expensive, inadequate, and of poor quality (because they know the contractor is slow to pay, the ability to pay is not high enough, poor control, weak material management, material suppliers will overtake these weak contractors easily). This will result in large-scale construction in many aspects, leading to great harm to investor.

     Investors should choose good contractors, have many years of experience, professional, have good management ability, reasonable price and not sell the contract.

- After selecting the construction contractor, please transfer the technical design documents to the contractor for their understanding, suggestions on some unreasonable places (if any), create The conditions for the construction work are good.

- Based on the technical design specifications, the construction contractor will estimate and issue a detailed construction quotation for the owner or the developer may also require the construction company to quote on the meter. Use the enclosed design drawings and a full range of supplies for the facility.

- After agreeing on the construction quotation, the investor shall begin to sign the construction contract with the contractor. After signing a contract with a good construction contractor, contractors should pay for the following items: Iron and steel, brick and mortar contracts, cement, doors, etc. So safe for work, not afraid of slipping.

       If the developer chooses a professional contractor, the contractor should provide the contractor with supplies, because good contractors usually buy large quantities of supplies for many projects, so the supplier Grade material sells at cheaper prices than self-procured homeowners and good contractors are regular customers of construction material suppliers so suppliers do not dare to recheck goods in quality as well as quantity. Investors will buy the materials themselves will pay higher prices, easy to be cheat suppliers in terms of quantity and quality of materials.

- Procurement of materials can be done after step 6, but nowadays building materials prices fluctuate incessantly, the preparation to buy materials soon can avoid price escalation, avoid arising cost, and can be more active in organizing construction. So after signing a contract with a well-established contractor, contractors should buy the main materials such as iron and steel, brick, cement, door types. .... so safe for work, not afraid of slipping.

- For raw materials, the technical requirements are above all, so it is not necessary to choose materials that are both good quality and beautiful because it would be unnecessarily expensive. For example, building foundation is not necessary to choose type A brick, but choose brick type C because bricks are too old, partly covered with clay, good compression is suitable for the foundation of the house. lowland. As for finishing materials, besides quality consideration, do not ignore its form as this finishing material will be the "face" for pre-engineered steel buildings. 

       At this stage, you need to do some work for neighbors, residents in the area. Specifically, let's talk about, asking for permission to start the upcoming, thanks to them to help facilitate the construction process. At the same time, it is also a good idea to check the current status of houses in the surrounding area so that when building, if affecting their houses (structural cracking, sinking, etc.) The specific basis for negotiating compensation, also avoided the situation "muddy water stork" (buffalo lance usually buffalo), can degraded situation, damaged their home before the house was built, But I still have to take responsibility, ...

- There are many construction companies and contractors in the whole country. However, the number of experienced and conscientious construction companies is not good. Should we advise customers how to choose the following:

  The selected contractor must be a contractor who has been trained at the University of Construction (eg Polytechnic University - Faculty of Construction) ... and has worked for many years in the project, has built many works. So, they have drawn a lot of experience to do something to make the works are good (no subsidence, no cracks, no flooring, no walls, no electrical problems, no leaks water drainage ... beautiful house for beautiful villas and suitable feng shui). Construction equipment must also be adequate and skilled workers. It is also very important that the contractor be conscientious with his profession and work. Direct construction, not to sell the contract. 

  You miss the contractor non-experience, irresponsible, no conscience, the works are not good, fast down. Money lost, disability brought.

  The quality of the workshop depends on the quality of materials and especially the construction techniques. If the materials are good and the construction techniques are poor, the works are of poor quality. Only good contractors and many years of experience have good construction techniques, so the works are of good quality.

   Please note the following  :  With the same design drawings, the same type of materials used for the project, the contractor has good capacity, many years of experience will implement the works of better quality and Ensure the right progress of construction  . Also with that design and the same material that the contractor lack of experience, have the ability to perform weak construction quality will be worse, long construction time, the level of safety is not guaranteed. The cost of the contractor has a lot of experience, good capacity may be slightly higher than the contractor's non-experience, weak capacity. In return, you choose the experienced contractor will have good products, longer life, no cost to repair and repair, ... Money must be repaired due to wrong choice of contractors will be higher The price difference and the product is also not sustainable ...

        There are a number of investors when the construction of large and too busy to ask the consultant to choose the construction contractor and have a lot of negative as follows: the person who the investor consulted always have the company Their backyard, so when the investor put several contractors they themselves invited to participate in construction quotes. This adviser informs the backyard company of the price of some of the contractors that the owner invites themselves and the consultants find ways to make it difficult for other contractors to refuse to continue to participate and ultimately the company. Backyard of construction consultants. The backyard company is certainly not good and also has to spend the consultants 10% of the value of the building. During the construction process, they together with the back yard company to cut a lot of things, reducing the quality of work to compensate for their (consultant) block catering company backyard 10%. The temple closes his mouth. Poor backyard contractors, the consultants of the owner never talked to them. Therefore, Quoc Cuong Construction Company Limited recommends that you choose the construction contractor, do not go through the intermediary (the consultants), certainly the above negative.

       Even if the owner of the investment team would like to keep the price confidential, the consultants will do the following: For example, investors have quoted the bidder of 9 billion dong and 9.2 billion dong respectively. VND (the project has a real value of 9.2 billion). The company's backyard consultants have a price of 10 billion. In addition, the consultants have colluded very well with their backyard company to make 10 discount letters with the red seal (they are stored in the bag). These discounts decreased by 0.5% to 10%, respectively, down 50 million, down 100 million, down 200 million, down 300 million, down 400 million, down 500 million, down 600 million, down 700 million, down 800 million, down 900 million. When the consultants open quotation results, the opening bid of two contractors of the investor himself is valued at 9 billion and 9.2 billion. Then the consultants know the price of the company's backyard is 10 billion, their market told them to take a discount letter 900 million VND sandwiched into the quotation of the company backyard. They told the owner that the price of the backyard company was down from 10 billion to 10 billion (9 billion) and 9 billion billion (between 9 billion and 9.2 billion). Of course, the investors are not professional, blindly trust the consultants, so the consultants say that the backyard company will be better, better techniques and defame the other two companies. Eventually the owner chooses the backyard company of the consultants (so we finished the dark plot). The consultants will receive 10% of the contract value from the backyard company and of course they have to protect their company during the construction process with bad quality (10% common). In the end, you receive a poorer quality villa than the contractor you invite yourself and choose yourself (because the building was severely thwarted by 10%). Right before and during the selection of contractors, the consultants have been fraudulent, in the course of the process of construction quality also.

     In the case of two contractors, the investors have the price of 9.3 billion dong and 9.5 billion dong respectively. The company's backyard consultants have a price of 10 billion. The consultants took a 600 million dong discount on the company's back yard quote. They told the owner that the price of the backyard company would decrease from 10 billion dong to 10 billion dong (9.4 billion dong) and 9.5 billion dong (between 9.3 billion dong and 9.5 billion dong).

       Therefore, Quoc Cuong Construction Company Limited recommends that you choose the construction contractor ,  do not go through the intermediary (the consultants), certainly the above negative .    

       To know the contractor well, experience, .. You should directly consult the contractor, see the license from which year, see the works they have been doing, ask the investor before Characteristics and products of the contractor.

 

QUOC CUONG CONSTRUCTION TRADING CO., LTD

PRICE PREPAYER, PREPAYER DESIGN. FACILITY PLASTIC PRODUCTS MANUFACTURING FACTORY. LOCATION: CHAU THANH DISTRICT, TAY NINH PROVINCE.MARCH 2014 .

QUOC CUONG CONSTRUCTION TRADING CO., LTD

 PRIVATE PREPAYMENT HOUSES AND BUILDINGS. TIEN PHAT PLASTIC PLASTIC PRODUCTS MANUFACTURING FACTORY. LOCATION: CHAU THANH DISTRICT, TAY NINH PROVINCE. JUNE2014 .

 Quoc Cuong Trading Construction Co., Ltd is well-qualified architects and engineers, over 20 years of experience and good heart, skilled workers, experienced, full equipment. , modern construction works with the best quality, most aesthetic for your work. Please come to Quoc Cuong Company to receive good service with the best quality, reasonable price. Find out more in the guide building prefabricated house. 

     Finally, wish you good luck and prosperity in the work of building a prefabricated house for yourself, a job is not simple! 

      Engineer Vu Thu Cuong (graduated from Da Nang University of Technology in 1994, Faculty of Civil and Industrial Construction) * Director of Quoc Cuong Trade Construction Co., Ltd.

 Headquarter address: 285 Vuon Lai, Phu Tho Hoa Ward, Tan Phu District, Ho Chi Minh City, Vietnam

 Website: nhatienche.vn ,  quoccuong.com.vn ,  xaynha.com ,  nhatheptienche.net.vn ,  nhatienche.net.vn

 Email: qc@quoccuong.com.vn

 Phone: 028.39782004 , 028.39782759

 Hotline: 0903831312 , 0988.55.88.79

construction of prefabricated houses, building of prefabricated houses, building of houses, building of beautiful houses, mills, mills, houses, houses, houses, mills, construction companies, bake mills home improvement, home improvement, home improvement, home improvement, prefabricated buildings, prefabricated houses