Saving package | Basic package | Expansion Pack | Professional package | Premium package | |
Total contract execution time, regardless of the time of exchange
|
12 days | 45 days | 35 days | 25 days | 17 days |
Preliminary time | 07 days | 25 days | 20 days | 15 days | 10 days |
Technical time | 05 days | 20 days | 15 days | 10 days | 7 days |
Number of design options | first | first | first | first | first |
Perspective drawing | 1 room | 2 rooms | 3 rooms | 4 rooms | All rooms |
Interior layout | ● | ● | ● | ● | ● |
Profile of furniture deployment | ● | ● | ● | ● | |
Electric and water records | ● | ● | ● | ||
Profile ceiling, wall, floor | ● | ● | ● | ||
Supervise the author | ● | ● | |||
Construction supervision | ● | ||||
Unit price |
5,000,000 (VND) | 90,000 (VND / m2) | 110,000 (VND / m2) | VND 140,000 (VND / m2) | VND 160,000 (VND / m2) |
Area coefficient: - The above unit price applies only to civil interior spaces (houses, apartments). Other space such as showroom, exhibition, office fees will be higher depending on the case. - If the total floor area is over 300 m2, multiply the unit price with the coefficient of 0.9. - If the total floor area is from 100 to 300 m2, multiply the above unit by coefficient 1. - If the total floor area is from 50 to 100 m2, multiply the above unit by the coefficient of 1.25. - If the total floor area is less than 50 m2, multiply the above unit by the factor of 1.6. - The above coefficients do not apply to the Savings package |
HOUSEHOLD EXTERIOR DESIGN CONSULTING OFFICE EXHIBITION OFFICE