HOUSEHOLD EXTERIOR DESIGN CONSULTING - OFFICE - EXHIBITION
Saving package | Additionalpackage |
Basic package |
Expansion Pack |
Professionalpackage |
Package Premium |
|
![]() |
55 days | 50 days | 40d | 35 days | ||
![]() |
25 days | 20 days | 15 days | 15 days | ||
![]() |
30 days | 30 days | 25 days | 20 days | ||
![]() |
0% | 0% | 0% | 0% | ||
![]() |
● | |||||
![]() |
● | ● | ● | ● | ||
![]() |
● | ● | ● | ● | ● | ● |
![]() |
● | |||||
![]() |
● | |||||
![]() |
● | ● | ● | ● | ||
![]() |
● | ● | ● | ● | ||
![]() |
● | ● | ● | |||
![]() |
● | ● | ||||
![]() |
● | |||||
![]() |
● | ● | ||||
Unit price |
7tr | 9tr | 90,000 (VND / m2) | 110,000 (VND / m2) | VND 140,000 (VND / m2) | VND 160,000 (VND / m2) |
ADDITIONAL DOCUMENTS: | Unit price (add to unit price) | Time (plus time) | ||||
![]() |
+60,000 (VND / m2) | + 5 days (in round 1) | ||||
![]() |
+40,000 (VND / m2) | +5 days (on stage 2) | ||||
![]() |
+10,000 (VND / m2) | + 2 days (on stage 1) | ||||
![]() |
+25,000 (VND / m2) | +5 days (on stage 2) | ||||
Area coefficient: - If the total floor area is over 350 m2, multiply the unit price with the coefficient of 0.9. - If the total floor area is from 250 to 350 m2, multiply the unit price with the coefficient 1 - If the total floor area is from 150 to 250 m2, multiply the above unit by 1.2 - If the total floor area From 50 to 150 m2, multiply the unit price with the factor of 1.6 - If the total floor area is less than 50 m2, multiply the unit price with the coefficient of 2. - The provisions multiplied by the above coefficient does not apply to Savings package and add-on package Rehabilitation coefficient: |